製造
目前本網頁沒有您所用語言的版本。您可使用 Google 翻譯來瀏覽
自動翻譯。我們並不負責提供此服務,我們也未檢查翻譯結果。
Stonehouse manufacturing facility
In addition, there have been some significant capital commitments to coincide with the relocation such as additional Mazak FJV machines, a new anodising plant, new auto-deburring and raw material processing equipment, and future plans for improvements to cleaning technologies used throughout the various stages of piece part production. We now have some 150 employees at Stonehouse, with 70 machine tools producing around 300,000 parts each month.
The former Machine Hall at New Mills has been transformed into a pre-production factory housing a model-shop and pre-production machine shop, as well as a pre-production electronics facility and nursery assembly cells. At Woodchester, the next phase of refurbishment includes a building formerly occupied by a tenant to create additional space for assembly and despatch. In India, the new building located in Pune will enable the Group to manufacture components which it currently buys in, together with potential metrology products which had not been previously considered due to the cost of manufacture. Further application software will also be developed for the Group's existing and new products. Reports
下一步如果您需要 更多資訊, 查詢定價 或有其它要求,您可以直接聯絡 當地Renishaw 辦事處。 |